Locations
Locations
Headquarters
Warehouse
Broward
Palm Beach
305-278-8523 Mon - Fri • 7:30AM - 4:30PM Located in Miami-Dade, Broward, and Palm Beach county.
305-278-8523 Mon - Fri • 7:30AM - 4:30PM 13200 SW 128th St. Suite B-1, Miami, FL 33186
305-278-8523 Mon - Fri • 7:30AM - 4:30PM 5829 NW 158th Street, Miami Lakes, FL 33014
305-278-8523 Mon - Fri • 7:30AM - 4:30PM 1900 NE 7th Ave, Suite A, Dania Beach, FL 33004
305-278-8523 Mon - Fri • 7:30AM - 4:30PM 3300 Electronics Way, West Palm Beach, FL 33407

Contractor’s Toolbox

Welcome to our Contractor’s Toolbox page. We have created this site with you in our minds; we want to provide you with great tools and valuable information to make your job easier in the field.

Carrier Literature

Air Handler Unit
39LInstallation, Operation, & Maintenance ManualDownload Now
39MInstallation, Operation, & Maintenance ManualDownload Now
39SInstallation, Operation, & Maintenance ManualDownload Now
 
Packaged Air Handler Unit
40RUA (6-24)Installation, Operation, & Maintenance ManualDownload Now
40RUA (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUS (7.5-24)Installation, Operation, & Maintenance ManualDownload Now
40RUS (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (6-24)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (25-30)Installation, Operation, & Maintenance ManualDownload Now
 
Chiller (Air Cooled)
30RAP (10-150)Installation, Operation, & Maintenance ManualDownload Now
30RAP (11-60)Installation, Operation, & Maintenance ManualDownload Now
30RB (60-390)Installation, Operation, & Maintenance ManualDownload Now
30RB (80-390)Installation, Operation, & Maintenance ManualDownload Now
30XA (265-1,740)Installation, Operation, & Maintenance ManualDownload Now
30XA (490-1,230)Installation, Operation, & Maintenance ManualDownload Now
30XV (140-500)Installation, Operation, & Maintenance ManualDownload Now

Carrier Literature

Water-to-Air
39LInstallation, Operation, & Maintenance ManualDownload Now
39MInstallation, Operation, & Maintenance ManualDownload Now
39SInstallation, Operation, & Maintenance ManualDownload Now
 
Packaged Air Handler Unit
40RUA (6-24)Installation, Operation, & Maintenance ManualDownload Now
40RUA (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUS (7.5-24)Installation, Operation, & Maintenance ManualDownload Now
40RUS (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (6-24)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (25-30)Installation, Operation, & Maintenance ManualDownload Now
 
Chiller (Air Cooled)
30RAP (10 – 150)Installation, Operation, & Maintenance ManualDownload Now
40RUA (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUS (7.5-24)Installation, Operation, & Maintenance ManualDownload Now
40RUS (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (6-24)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (25-30)Installation, Operation, & Maintenance ManualDownload Now
40RUQ (6-24)Installation, Operation, & Maintenance ManualDownload Now